Friday, July 27, 2012

Lots of new things!

There were so many new things in the house today! On the outside, all of our landscaping was done, our garage door installed, air conditioner installed, and we are officially locked out.  On the inside, the final painting was completed, the HVAC vents installed, thermostats, security system keypads and sensors, appliances, and our granite countertop! 

All that is left are the light fixtures, outlet covers, and the floors!

Garage Door and Sod

Living Room

View from front door

Stairs

Kitchen with countertops and appliances

Gas Range!

Garage Door Opener

Guest Bathroom with faucet!

Toilet in guest bath

Master Bath toilet

Our tile in the master bath!

It looks so good!

Mess in the closet in laundry room

Laundry Room

Loft

Oops..broken stair

Family Room

Kitchen


I love it!

Neighbors lot is graded and the house behind us is going up

AC unit

Wednesday, July 25, 2012

Locked in!

We locked in our interest rate yesterday at 3.375! We are one step closer to being in our dream home!

Monday, July 23, 2012

Cabinets, Floors, and More!

We knew that the cabinets went in last week so we were so excited to see them! We absolutely love them! They also put in all the crown molding and most of the baseboards.  The walls had their first coat of paint and the railings were put in upstairs in downstairs. All the interior doors are in as well (I'm loving the new two panel doors). The vinyl was done in the secondary bath and the laundry room. Enjoy!


Front Pillar is in

Crown molding

Baseboards in Living Room

Dining Room

Crown Molding in Foyer

Family Room

Kitchen

LOVE, LOVE, LOVE our cabinets!





Second Bath


Laundry Doors

Vinyl in Bathroom




Attic Stairs!

Lots of Storage Space


Loft

Upstairs Railing


Master Bath




Attic

Mirrors and Screens in the garage